How to Plan a Bathroom Renovation in London: Budgets, Timescales and Permits

Scope, budget, permits and the work behind the tiles — in the order it actually happens

A bathroom is one of the smallest rooms in the house and one of the most complicated to renovate. Water, electricity, drainage and ventilation all meet in a few square metres, and most of what decides whether it lasts ends up hidden behind the tiles.

This guide walks through planning a bathroom renovation in London in the order it actually happens: deciding the scope, setting a budget, the rules that apply in England, how long it takes, and what has to be right before the tiles go on. Where we quote a figure or a rule, we link to where it comes from.

Refresh, refit or new layout?

Decide which of these jobs you are doing before you look at a single tile, because each one costs and takes very different amounts of time.

Damaged and water-stained bath panel in a bathroom, NW4
Before: a bath panel ruined by water (NW4).
New white bath panel fitted to the same bath, NW4
After: a new panel, part of a simple refresh.

Setting a realistic budget in London

Published cost guides vary widely, which tells you how much the result depends on size, finish and what is changing. As a sense of scale:

What moves the figure most: tile size and quantity, whether the layout changes, the quality of the suite and brassware, and what is found when the old tiles come off. Keep some money back for rotten floorboards, old pipework or a wall that needs re-boarding. Every bathroom we do is quoted individually after a survey, so treat these ranges as a sense check, not a quote. For more on costs, see our bathroom remodel budget guide.

Permits and the rules that apply

Most bathroom refits in England need no planning permission. Here is what can apply.

Electrics: bathroom zones explained

Bathrooms are divided into zones around the bath and shower, and what can be fitted depends on the zone. NICEIC describes them like this (NICEIC):

In England, any electrical installation or alteration within zones 0, 1 or 2 is notifiable building work, so it needs an electrician registered with a competent person scheme, who can self-certify it. All circuits in or passing through a bathroom must be RCD protected, ordinary sockets are not allowed unless they are at least 2.5 metres from the bath or shower tray, and an electric shower must be fitted by a registered electrician on its own circuit. (Electrical Safety First)

Ventilation: the extractor fan you need

Under Part F of the Building Regulations, a bathroom (any room with a bath or shower) needs an extractor fan of at least 15 litres a second if it runs intermittently, or 8 litres a second if it runs continuously. The fan should be mounted as high as practical, no more than 400mm below the ceiling. (Approved Document F)

During a refurbishment, an existing fan should be kept or replaced, never just removed, and replacing a fan on its existing cabling doesn't need notifying. A bathroom without a working fan is the most common reason we see mould come back on a ceiling within months of it being painted.

Bathroom ceiling repainted after damp, with downlights and a window, E1
A bathroom ceiling made good after damp (E1). Without good extraction, the problem returns.

Waterproofing: the part you never see

The tiles are not what keeps water out of your walls. The Tile Association is clear that water-resistant adhesive and grout are no substitute for a proper waterproof tanking system, as set out in the British Standard for tiling in wet areas (BS 5385 Part 4). Where a shower gets heavy, repeated use, a tanking system should go on before any tiles; moisture-resistant plasterboard alone is only acceptable in lighter conditions. A newly tiled shower should be left at least 14 days before it is used. (The Tile Association)

This is the step that most often gets skipped, because nobody sees it once the tiles are up, and the failure turns up months later as a stain on the ceiling below. Ask anyone quoting for your bathroom exactly what will go behind the tiles in the shower area.

Clean silicone seal around a white shower tray with stone-effect tiles, HA6
A clean, continuous seal round a shower tray (HA6): the last line of defence, not the first.

Getting more from a small London bathroom

Many London bathrooms are narrow, and a few choices make a big difference to how they feel. Homebuilding & Renovating's suggestions include a wall-hung WC and basin, which free up floor space, a frameless shower screen and slim shower tray, a shower over the bath where there is no room for both, shallow vanity units as narrow as 380mm and a mirrored cabinet for storage. A concealed cistern can be as thin as 75mm, so it fits inside a new stud wall. (Homebuilding & Renovating; wall-hung toilets)

Exposed toilet cistern and pipework inside a timber frame, SW11
Before: an exposed cistern and pipework (SW11).
Cistern boxed in behind a white panel with a flush plate and shelf, SW11
After: boxed in, with a shelf on top and an access panel.

Whatever you box in, plan an access panel for the cistern and any valves. A boxed-in cistern you can't reach turns a five-minute repair into a tiling job.

How long a bathroom renovation takes

Published guides put fitting a new bathroom at around 6 to 8 days, with more complex jobs taking 7 to 15 days. Others range from as little as four days to three weeks. (MyJobQuote; Rated People) On site, the work usually runs in this order:

  1. Strip out the old suite and tiles, and protect the rest of the house.
  2. First fix: supply pipes, waste, and any electrics for lights, fan or a shower.
  3. Boards and waterproofing: re-board where needed and tank the shower area.
  4. Tiling, then grouting.
  5. Second fix: fit the suite, taps, shower, fan, lights and towel rail.
  6. Seal, decorate, clean and hand over, then leave the shower the recommended time before first use.

If it is your only bathroom, plan for some days without a working shower or WC, and ask how the work will be staged to keep that as short as possible.

Your planning checklist

Before you book a bathroom renovation

  • Scope decided: refresh, like-for-like refit or new layout.
  • Budget set, with money kept back for what is behind the old tiles.
  • New bathroom or en-suite? Building regulations approval is likely.
  • Leasehold or listed? Consent asked for in writing first.
  • Electrics in zones 0 to 2 planned with a registered electrician.
  • Extractor fan of at least 15 l/s, kept or replaced.
  • Tanking agreed for the shower area, not just tiles and grout.
  • Access panel planned for any boxed-in cistern or valves.
  • Days without a bathroom planned for, if it's your only one.
  • Certificates collected and filed at the end.

Bathroom renovation with Handy 4 London

We carry out bathroom renovations in London across Harrow, Uxbridge and North West, West & Central London: full refits, en-suites and shower rooms, with new suites, tiling, waterproofing and lighting. You get a clear quote after a survey and a timeline before we start. And if your bathroom only needs a refresh — new sealant, a bath panel, a vanity unit or a boxed-in cistern — our handyman team can do that for a fraction of the cost. We will tell you honestly which one you need.

Planning a bathroom renovation?

See what's included and how we work, then ask for a free survey and quote.

See Our Bathroom Renovations →
← Back to Blog