Get Quote
WhatsApp
Call us WhatsApp

How to Plan a Kitchen Refurbishment in London: Budgets, Timescales and Prep

Scope, budget, the rules that apply and how to get your home ready — in the order it actually happens

A kitchen refurbishment is the biggest single job most London homeowners take on, and almost all of the expensive mistakes happen before anyone picks up a tool. Units ordered before the walls were measured. A recirculating cooker hood that doesn't meet the regulations. A new circuit nobody certified, which turns up years later when you come to sell.

This guide walks through the planning in the order it actually happens: deciding the scope, setting a realistic budget, the rules that apply in England, how long it takes, and how to get your home ready. Where we quote a figure or a rule, we link to where it comes from.

Refresh, refit or new layout? Decide the scope first

Before you look at a single brochure, decide which of these three jobs you are actually doing, because each one costs and takes very different amounts of time.

Most budget overruns start as a refit that quietly turns into a new layout halfway through. Decide which job it is at the start, and stick to it.

White gloss kitchen with a black worktop and stainless steel sink after a worktop repair and repaint, Ruislip HA4
Not every kitchen needs replacing: a worktop repair and a repaint in Ruislip (HA4).

Setting a realistic budget in London

There is no single price for a kitchen, but published cost guides give a useful sense of scale. As of 2026:

The biggest things that move the figure are the size of the room, the quality of the units and worktop, whether the layout changes, and how much making good the walls and floor need once the old kitchen is out. Keep some money back for the things nobody can see until the units come off the wall: a damp patch, a rotten section of floor, or old wiring that needs an electrician.

Every kitchen we do is quoted individually after a survey, so treat the ranges above as a sense check, not a quote.

Permissions and the rules that apply

Most kitchen refurbishments in England need no planning permission at all. Here is what can apply, depending on your home.

Keep every certificate. When you sell, your buyer's solicitor will ask for them.

Ventilation: the cooker hood question

This is the rule people most often get wrong. Under Part F of the Building Regulations, a kitchen needs extract ventilation: 30 litres a second from a cooker hood that extracts to the outside, or 60 litres a second from an extract fan elsewhere in the room if there is no such hood. A recirculating cooker hood on its own, which filters the air and blows it back into the room, does not meet the requirement. (Approved Document F)

When a kitchen is refurbished, any existing extract fan or ducted cooker hood should be kept or replaced, not taken out. Replacing a hood on its existing cabling does not need notifying. In practice this means deciding early where the duct will run, because it affects where the hob can go and which wall units you can have.

Chimney cooker hood fitted between two wooden wall units above a tiled splashback, SW3
A chimney cooker hood fitted between wall units (SW3).

How long a kitchen refurbishment takes

Published guides put the fitting itself at somewhere between 5 and 10 working days and around two weeks, depending on the size of the kitchen and how much is changing. (Rated People; MyJobQuote) That is the time on site. Before it come the design, the survey and waiting for units to be delivered, which can take longer than the fit.

On site, the work usually runs in this order:

  1. Strip out the old kitchen and protect the rest of the house.
  2. First fix: plumbing, waste, any gas and electrics roughed in where the new layout needs them.
  3. Make good: plastering and any floor repairs, then let the plaster dry.
  4. Fit the base and wall units, level and square.
  5. Worktops: laminate and wood are usually fitted straight away; quartz and stone are templated once the units are fixed, level and square, and fitted after they have been made.
  6. Splashback or tiling, then second fix: taps, sink, appliances, sockets and lights.
  7. Decorate, clean and hand over.

The worktop is the step that catches people out. A stone or quartz top cannot be measured until the units are in, so plan for a gap between the units going in and the worktop arriving. (Howdens) Ask your supplier how long their lead time is before you book anything else around it.

Getting your home ready

A little preparation makes the weeks without a kitchen much easier, and it saves time on site.

Common mistakes we see

Your planning checklist

Before you book a kitchen refurbishment

  • Scope decided: refresh, like-for-like refit or new layout.
  • Budget set, with money kept back for surprises behind the old units.
  • Listed? Check with the council before planning anything.
  • Leasehold? Freeholder's consent requested in writing.
  • Gas work planned with a Gas Safe registered engineer.
  • New circuits or consumer unit planned with a registered electrician.
  • Extraction decided: ducted hood or extract fan, and where the duct runs.
  • Enough sockets for every appliance, and then some.
  • Worktop lead time checked with the supplier.
  • Temporary kitchen set up and cupboards emptied.
  • Space cleared for deliveries; parking and waste sorted.
  • Certificates collected and filed at the end.

Kitchen refurbishment with Handy 4 London

If you have read this far, you already know more about planning a kitchen than most people do when they first call a builder. The next step is a survey and a price you can rely on.

We carry out kitchen refurbishment in London across Harrow, Uxbridge and North West, West & Central London. One team handles the whole job, from stripping out the old kitchen to the final clean: units, worktops, plumbing, electrics, tiling and lighting. You get a fixed written quote after a proper survey, a timeline before we start, and a 12-month workmanship guarantee when we finish. Already bought your kitchen from a retailer? We can fit that too. And if your kitchen only needs a refresh rather than a replacement, our handyman team can re-hang doors, repair worktops and repaint for a fraction of the cost. We will tell you honestly which one you need.

Planning a kitchen refurbishment?

See what's included and how we work, then ask for a free survey and quote.

See Our Kitchen Refurbishments →
← Back to Blog